Tidewater Home Improvement LLC
Scope of Work & Estimate — Estimate 1428
1406 Antoinette Cir, Hampton, VA 23663
$1,801.00 Estimate — deposit $900.50 to schedule
1406 Antoinette Cir · Hampton, VA 23663
Kitchen Damage Repair · Framing, Subfloor, Insulation, Drywall & Trim
View PDF Accept & Pay Deposit Estimate valid until 10/07/2026
Project Overview
Customer: Chris Conley
Project: Kitchen Damage Repair — Water Damage
Address: 1406 Antoinette Cir, Hampton, VA 23663
Estimate #: 1428
Work area: wall behind the sink & window
Cause: moisture damage found during the floor work
Kitchen Damage Repair — Framing, Subfloor, Insulation, Drywall & Trim
  • Framing & Carpentry — Sister 16 LF of 2x4 wall studs (4 studs @ 4 ft) behind the sink area; replace 9.5 LF of window sill/plate framing (bottom plate @ 3.5 ft + 2 jack studs @ 3 ft); cut out and install an 18 SF section of 3/4 in. exterior plywood subfloor with blocking.
  • Insulation — Install 24 SF of R-13 kraft-faced fiberglass insulation in the wall cavities behind the sink and window.
  • Drywall & Paint — Hang, tape, mud, sand and prime 27 SF of mold-resistant greenboard on the lower wall beneath the window and the cutouts; prep, caulk and touch up paint on the 3.5 LF window apron trim.
  • Debris & Disposal — Haul away damaged lumber, subfloor, drywall scraps and jobsite waste.
Project Total$1,801.00
Payment Schedule
Deposit to Schedule
$900.50
Upon signing
Final Payment
$900.50
Upon completion
Total Project Cost: $1,801.00 · Check is a preferred method · Pay by credit card: request.plastiq.com/pay-tidewater-home-improvement-llc (Virtual Affirm credit card not eligible)
Terms & Conditions

Scope: sistering 16 LF of 2x4 wall studs behind the sink area; replacing 9.5 LF of window sill/plate framing; cutting out and installing an 18 SF section of 3/4 in. exterior plywood subfloor with blocking; installing 24 SF of R-13 kraft-faced insulation; hanging, taping, mudding, sanding and priming 27 SF of mold-resistant greenboard; prep, caulk and touch up paint on the 3.5 LF window apron trim; and hauling away the damaged material and jobsite waste.

Notes: jobsite will be left clean once the work is completed. The contractor is not responsible for damage caused inside the home while repairing.

Warranty: 12 months workmanship on the project.

Not included: cabinet or countertop removal and reinstallation; flooring installation; painting of the full room; mold, fungus or disinfectant treatment; permits.

Payment terms: total project cost $1,801.00 · deposit to schedule $900.50 · final payment on completion $900.50.

Validity: valid until 10/07/2026.